In the Edit Crane Shift dialog box, enter the following information in the Equipment Levels area:
#RTGs: Specify the number of RTGs for the work shift.
#Forks: Specify the number of Forks for the work shift.
For each of these options, you can specify whether the RTGs or Forks are pooled or assigned to a POW. If a crane is unavailable for discharge, check the Unavailable While QC Disc option.